Worked Example: Lumen-Method Fixture Count for an Open-Plan Office and a Car Park Traffic Route

The same EN 12464-1 lumen-method formula applied to a 500 lux interior office and a 75 lux exterior car park traffic route — two very different target illuminances driving two very different fixture counts.

Scenario

Room 1: Open-plan office10 m x 8 m, mounting height 2.5 m, target 500 lux
Luminaire (office)4000 lm, UF=0.55, MF=0.8
Area 2: Car park traffic route40 m x 20 m, mounting height 8 m, target 75 lux
Luminaire (car park, floodlight)20,000 lm, UF=0.45, MF=0.75

Step-by-step calculation

Step 1: Compute the office's room index and exact luminaire count

K = (L x W) / (Hm x (L+W)) nExact = (E x Area) / (flux x UF x MF)
(10x8)/(2.5x18) = 1.78 (500 x 80) / (4000 x 0.55 x 0.8)
K = 1.78, nExact = 22.73 luminaires

Step 2: Round up to a whole number of luminaires and find the achieved illuminance

nRequired = ceil(nExact) achievedLux = (n x flux x UF x MF) / Area
ceil(22.73) = 23 (23 x 4000 x 0.55 x 0.8) / 80
nRequired = 23 luminaires, achieved 506.0 lux (comfortably ≥ 500 lux target)

Step 3: Repeat the same method for the exterior car park route (subscriber-tier area type)

K = (L x W) / (Hm x (L+W)) nExact = (E x Area) / (flux x UF x MF)
(40x20)/(8x60) = 1.67 (75 x 800) / (20000 x 0.45 x 0.75)
K = 1.67, nExact = 8.89 → nRequired = 9 floodlights

Step 4: Check the achieved illuminance for the car park

achievedLux = (n x flux x UF x MF) / Area
(9 x 20000 x 0.45 x 0.75) / 800
achievedLux = 75.94 lux (≥ 75 lux target)

Result summary

CheckRequirementActualStatus
Office achieved illuminance≥ 500 lux506.0 lux✓ PASS
Office luminaire countn/a (sizing basis)23 luminaires✓ PASS
Car park achieved illuminance≥ 75 lux75.94 lux✓ PASS
Car park luminaire countn/a (sizing basis)9 floodlights✓ PASS
The office needs 23 luminaires at 4000 lm each to hold 500 lux, achieving 506.0 lux. The car park traffic route, despite covering ten times the floor area, needs only 9 floodlights because its 75 lux target is 85% lower than the office's — illuminance target, not room size alone, is what drives luminaire count.

Key insight: The lumen method's fixture count scales with the ratio of target illuminance to (luminaire output x utilization x maintenance factor) x area — a large area with a low target (like a car park route) can need far fewer fixtures than a small area with a high target (like a technical drawing office at 750 lux), which is why area alone is a poor proxy for lighting cost or fixture count without also weighing the target illuminance for that specific space type.

Try it with your own numbers

Every input in this example is editable in the live calculator — free, no signup.

Open Lighting Design calculator →

Frequently asked questions

What do the utilization factor (UF) and maintenance factor (MF) actually represent?

UF accounts for how much of a luminaire's emitted light actually reaches the working plane, given room proportions, mounting height, and surface reflectances — a low, wide room with light-colored walls has a higher UF than a tall, narrow room with dark surfaces. MF accounts for the light loss expected over the maintenance cycle from lamp lumen depreciation and luminaire dirt accumulation before the next cleaning or relamping — both factors are why the same luminaire in two different rooms is very unlikely to hit the same lux value.

Why is the car park lighting listed as a subscriber-tier feature rather than free like the office?

Interior room types are free on this calculator, while exterior/area lighting types (car parks, building exteriors) are grouped as a subscriber feature — reflecting that exterior lighting design typically involves additional considerations (light trespass, glare, pole spacing) beyond the same basic lumen-method illuminance target used here.